PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued laying out gravel at the Main Loby (102) Facing South (800x600).jpg Installed Areaway Drains Facing East (800x600).jpg Poured concrete at the subgrade column E.3-6.5 Facing North (800x600).jpg Continued fixing the main steel column at the Monumental Stairs Facing South (800x600).jpg Continued installing Stairs -2 (2nd Floor) Facing West (800x600).jpg Installed metal decking at the Roof Facing South (800x600).jpg Started installing conduit at Stairs -5 Facing West (800x600).jpg
Previous pageNext page Continued fixing the main steel column at the Monumental Stairs Facing South (800x600)
Continued fixing the main steel column at the Monumental Stairs Facing South (800x600)